Skip to main content
How To Adjust the Validation Import Schedule in Equitrac Professional 5?
- Last updated
-
-
Save as PDF
Problem Statement:
With Equitrac Professional 5, the time and billing system creates a new validation import file more frequently than the Equitrac import scheduled task runs. As a result, new validation data is not available on a timely basis. How do you change the frequency with which the validation import scheduled task runs?
Problem Statement:
With Equitrac Professional 5, the time and billing system creates a new validation import file more frequently than the Equitrac import scheduled task runs. As a result, new validation data is not available on a timely basis. How do you change the frequency with which the validation import scheduled task runs?
Cause:
Configuration needs to be changed.
Resolution:
To modify the frequency with which the Validation Import scheduled task runs, edit the existing task in System Manager. Scheduled tasks can be run on a monthly, weekly, daily, hourly, minutely basis, as needed.