Skip to main content
Kofax

"Project exceeds the maximum allowable size..." Error Appears When Saving KTA Transformation Project

3019150

Question / Problem: 

When trying to save an existing TotalAgility (KTA) Transformation project after making some changes, the following error is produced.

"The project exceeds the maximum allowable size. Reduce the project size to less than 500 MB".

Is there a hard limit for the size of a Transformation project?

Answer / Solution: 

The KTA Transformation projects (classification and/or extraction) do have a maximum size limit, with the size varying according to the type of KTA installation that's in place. In the TotalAgility Online Help, search for any of these phrases...

MaxCaptureProjectSize
Export a process
Import a process

...the following information is returned in the results.

  • In TotalAgility Azure and On-Premise Multi Tenancy system, the maximum limit of the extraction and classification group is set to 500MB. When you exceed this limit, a message is displayed stating that the action cannot complete. You can configure this limit by updating the value for MaxCaptureProjectSize in the web.config file of TotalAgility Azure.
  • In TotalAgility On-Premise, the maximum limit of the extraction and classification group is set to 2GB. When you exceed this limit, a message is displayed stating that the action cannot complete. 

 

Applies to:  

Product Version
KTA All